U.S. gas turbine power plant's capital expenditure 2017-2050

This statistic represents the projected capital costs of a conventional gas turbine power plant in the United States in 2017, with projections for 2030 and 2050. In 2050, the capital costs of a gas turbine power plant is expected to total around 800 U.S. dollars per kilowatt.

Projected capital expenditure of a conventional gas turbine power plant in the United States from 2017 to 2050

CAPEX in U.S. dollars per kilowatt
--
--
--
Exclusive Premium statistic

You need a Premium Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Premium Account

only $59 / month *
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

2019

Region

United States

Survey time period

2017

Supplementary notes

All costs in 2017 U.S. dollars.
* Projections based on a mid-cost scenario based on R&D only.

Statista Accounts: Access All Statistics. Starting from $708 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account!

Premium Account
Your perfect start with Statista
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references

$59 / Month *

Corporate Account
Full access

Corporate solution including all features.

* All products require an annual contract.
   Prices do not include sales tax.

Statistics on "Electricity in Norway "

Statista Accounts: Access All Statistics. Starting from $708 / Year
Learn more about how Statista can support your business.