Try our corporate solution for free!
+1 (212) 419-5770
esther.shaulova@statista.com

U.S. enhanced geothermal systems power plant - capital cost in 2050

This statistic represents the projected capital costs of a typical enhanced geothermal systems power plant in the United States in 2008, 2010 and 2050. In 2008, the capital costs of an enhanced geothermal systems power plant amounted to around 10,400 U.S. dollars per kilowatt hour.

Projected capital costs of a typical U.S. enhanced geothermal systems power plant in 2008, 2010 and 2050

Exclusive Premium statistic

You need a Single Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Single Account

$39 $59 per month *
in the first 12 months
33% Discount until October 31st
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$468 / Year
$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

February 2012

Region

United States

Survey time period

2008 and 2010

Supplementary notes

All costs in 2009 U.S. dollars.

Statista Accounts: Access All Statistics. Starting from $468 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account.

Single Account
The ideal entry-level account for individual users
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references
$59 $39 / Month *
in the first 12 months
Corporate Account
Full access

Corporate solution including all features.

* All products require an annual contract; Prices do not include sales tax.

Statistics on "Global electricity"

Statista Accounts: Access All Statistics. Starting from $468 / Year
Learn more about how Statista can support your business.