Average time overrun for energy infrastructure projects as of 2014, by project type

This statistic displays as a percentage the average time overrun for electricity consumption projects across various project types, as of January 2014. Data is based on 401 energy infrastructure projects realised around the world. On average the time overrun for nuclear reactor projects was 64 percent.

Average time overrun for energy infrastructure projects worldwide as of 2014, by project type

Average time overrun
--
--
--
--
--
--
Exclusive Premium statistic

You need a Premium Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Premium Account

only $59 / month *
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

July 2014

Region

Worldwide

Survey time period

As of January 2014

Supplementary notes

Figures are based on data collected by the authors Benjamin Sovacool, Alex Gilbert and Daniel Nugent.
Study included 401 electricity infrastructure projects.
Cost figures were adjusted for currency differences and inflation based on the United States Dollar at 2012.

Statista Accounts: Access All Statistics. Starting from $708 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account!

Premium Account
Your perfect start with Statista
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references

$59 / Month *

Corporate Account
Full access

Corporate solution including all features.

* All products require an annual contract.
   Prices do not include sales tax.

Statistics on "Wind power in Denmark "

Statista Accounts: Access All Statistics. Starting from $708 / Year
Learn more about how Statista can support your business.