![Adriana Sas](https://cdn.statcdn.com/static/../CMS/contactperson/ERI1977_1591697939.png)
Installed capacity of nuclear power plant in Poland 2035-2045, by scenario
Poland's first nuclear power unit is expected to be built in 2035. Under the "slow optimization" scenario, seven units with a total capacity of 7.7 gigawatts are to be built every 2045. Under the strategic option, six nuclear reactors with a total capacity of 6.6 gigawatts are expected to be built by 2045.