U.S. pulverized coal-fired power plant: capital cost outlook 2050

This statistic represents the projected capital costs of a typical pulverized coal-fired power plant in the United States from 2008 to 2050. In 2008, the capital costs of a typical pulverized coal-fired power plant amounted to around 2,890 U.S. dollars per kilowatt hour.

Projected capital costs of a typical pulverized coal-fired power plant from in the U.S. 2008 to 2050

Exclusive Premium statistic

You need a Single Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Single Account

$39 $59 per month *
in the first 12 months
33% Discount until September 30th
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$468 / Year
$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

February 2012

Region

United States

Survey time period

2009 to 2010

Supplementary notes

All costs in 2009 U.S. dollars.

Statista Accounts: Access All Statistics. Starting from $468 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account.

Single Account
The ideal entry-level account for individual users
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references
$59 $39 / Month *
in the first 12 months
Corporate Account
Full access

Corporate solution including all features.

* All products require an annual contract; Prices do not include sales tax.

Statistics on "Global electricity"

Statista Accounts: Access All Statistics. Starting from $468 / Year
Learn more about how Statista can support your business.