U.S. base overnight costs of power plants by technology 2019

This statistic displays the base overnight costs of power plants in the United States as of 2019, broken down by major technology. During this year, a biomass plant had base overnight costs of approximately 4,080 U.S. dollars per kilowatt. Overnight costs refer to the cost of constructing the power plant if no interest rates were incurred during the construction process.

Power plant construction base overnight costs in the U.S. in 2019, by major technology (in U.S. dollars per kilowatt)*

Exclusive Premium statistic

You need a Single Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Single Account

$39 $59 per month *
in the first 12 months
33% discount until December 20th
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$468 / Year
$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

January 2020

Region

United States

Survey time period

2019

Supplementary notes

* 2019 U.S. dollars.
** Cost in terms of net AC power available to grid for installed capacity.
*** Cost and performance characteristics are site-specific, so costs represent least expensive plant that can be built in the Northwest Power Pool region, where most proposed sites are located.
**** Wind and both solar PV technologies' total overnight cost shows the average input value across all 22 electricity market regions, as weighted by the respective capacity of that type installed during 2018 in each region to account for the substantial regional variation in wind and solar costs. The input value used for wind in AEO2019 was $1,920 per kilowatt (kW), solar PV with tracking was $2,160/kW, and solar PV fixed tilt was $2,024, representing the cost of building a plant excluding regional factors. Region-specific factors contributing to the substantial regional variation in cost include differences in typical project size across regions, accessibility of resources, and variation in labor and other construction costs through the country.

MSW: municipal solid waste

Statista Accounts: Access All Statistics. Starting from $468 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account.

Single Account
The ideal entry-level account for individual users
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references
$59 $39 / Month *
in the first 12 months
Corporate Account
Full access

Corporate solution including all features.

* Prices do not include sales tax.

Statistics on "Energy prices in the U.S."

Statista Accounts: Access All Statistics. Starting from $468 / Year
Learn more about how Statista can support your business.