In 2021, the generation, storage, and hybrid electricity capacity in interconnection queues in the U.S. amounted to some 1.44 terawatts. This figure represents an increase of nearly one terawatt when compared to the beginning of the decade. Solar and solar hybrid projects had the highest capacity in queues in 2021, at 390 and 280 gigawatts, respectively.
Generation, storage, and hybrid electricity capacity in interconnection queues in the United States in 2010 and 2021, by source (in gigawatts)
Basic Account
Get to know the platform
You only have access to basic statistics.
This statistic is not included in your account.
Starter Account
The ideal entry-level account for individual users
- Instant access to 1m statistics
- Download in XLS, PDF & PNG format
- Detailed references
$69 USD $39 USD / Month *
in the first 12 months
Professional Account
Full access
Business Solutions including all features.
* Prices do not include sales tax.
Statistics on Energy storage in the U.S.
Overview
5
- Basic Statistic Global outlook on electricity generation 2020-2050, by energy source
- Premium Statistic Cumulative global energy storage deployment 2013-2030
- Premium Statistic Global electricity capacity from battery storage 2020-2050
- Premium Statistic Global investment in energy storage 2020, by region
- Basic Statistic Global pumped storage capacity 2021, by leading country
Key market indicators
5
- Premium Statistic Energy storage market size in the U.S. 2019-2025
- Premium Statistic Share of energy storage projects in the U.S. 2021, by technology
- Premium Statistic Rated power of energy storage projects in the U.S. 2021, by technology
- Premium Statistic U.S. storage technology providers 2020, by commissioned capacity
- Premium Statistic U.S. capacity of commissioned energy storage projects 2020, by owner
Batteries
6
- Premium Statistic U.S. grid battery storage investments 2017-2021
- Premium Statistic U.S. battery storage capacity additions 2019-2023
- Basic Statistic Battery storage usage factor in the U.S. 2013-2021
- Basic Statistic U.S. battery storage capacity 2020, by leading state
- Basic Statistic U.S. large-scale battery installations breakdown 2020, by chemistry
- Basic Statistic U.S. large-scale battery storage breakdown by ownership 2019
Pumped storage
4
Outlook
4
- Premium Statistic LDES cumulative installed capacity 2040, by country
- Premium Statistic Power capacity in interconnection queues in the U.S. 2010-2021, by source
- Premium Statistic Projected electricity generation from storage in the U.S. 2021-2050
- Premium Statistic Projected electricity generation from storage in the U.S. 2021-2050, by scenario
Further related statistics
21
- Energy industry use of electricity in the United Kingdom (UK) 2000-2021
- Installed power capacity in Portugal 2022, by source
- Installed solar power capacity in Portugal 2022, by region
- Installed power capacity in Spain 2015-2022
- Installed biomass power capacity in Portugal 2022, by region
- Power capacity in interconnection queues in the U.S. 2010-2021, by source
- Power capacity additions to interconnection queues in the U.S. 2010-2021
- Share of electricity production FY 2021, by energy source
- Installed power capacity in Turkey 1973-2022
- Wind power capacity in China 2014-2021
- Renewable power capacity of the main electricity suppliers in Spain 2021
- Price of commercial electricity in Latin America 2021-2022, by country
- Production of electricity in Portugal 2022, by source
- Electricity production from wind energy Japan FY 2012-2021
- Solar power capacity installed in China by province 2022
- Proposed solar power capacity additions in China by province 2022
- Power capacity of the main electricity suppliers in Spain 2021
- Installed renewable power capacity in Portugal 2022, by region
- Power capacity share of the main electricity suppliers in Spain 2021
- Installed wind power capacity in Portugal 2022, by region
- Wind power capacity in France 2021, by region
Further Content: You might find this interesting as well
LBNL . (April 13, 2022). Generation, storage, and hybrid electricity capacity in interconnection queues in the United States in 2010 and 2021, by source (in gigawatts) [Graph]. In Statista. Retrieved April 01, 2023, from https://www.statista.com/statistics/1305824/capacity-in-interconnection-queues-united-states-by-source/
LBNL . "Generation, storage, and hybrid electricity capacity in interconnection queues in the United States in 2010 and 2021, by source (in gigawatts)." Chart. April 13, 2022. Statista. Accessed April 01, 2023. https://www.statista.com/statistics/1305824/capacity-in-interconnection-queues-united-states-by-source/
LBNL . (2022). Generation, storage, and hybrid electricity capacity in interconnection queues in the United States in 2010 and 2021, by source (in gigawatts). Statista. Statista Inc.. Accessed: April 01, 2023. https://www.statista.com/statistics/1305824/capacity-in-interconnection-queues-united-states-by-source/
LBNL . "Generation, Storage, and Hybrid Electricity Capacity in Interconnection Queues in The United States in 2010 and 2021, by Source (in Gigawatts)." Statista, Statista Inc., 13 Apr 2022, https://www.statista.com/statistics/1305824/capacity-in-interconnection-queues-united-states-by-source/
LBNL , Generation, storage, and hybrid electricity capacity in interconnection queues in the United States in 2010 and 2021, by source (in gigawatts) Statista, https://www.statista.com/statistics/1305824/capacity-in-interconnection-queues-united-states-by-source/ (last visited April 01, 2023)
Generation, storage, and hybrid electricity capacity in interconnection queues in the United States in 2010 and 2021, by source (in gigawatts) [Graph], LBNL , April 13, 2022. [Online]. Available: https://www.statista.com/statistics/1305824/capacity-in-interconnection-queues-united-states-by-source/