Try our corporate solution for free!
+1 (212) 419-5770
esther.shaulova@statista.com

Typical 4-pile oil drilling facility removal costs by water depth 2012

This statistic outlines the costs of completely removing a typical 4-pile drilling/production facility in 2012, by water depth. The cost of removing a drilling/production facility at a depth of 50 feet was some 1.98 million U.S. dollars in 2012, while the cost of removing a drilling/production facility at a depth of 250 feet was some 3.69 million U.S. dollars in that year.

Typical 4-pile oil drilling/production facility removal costs in 2012, by water depth

Exclusive Premium statistic

You need a Single Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Single Account

$39 $59 per month *
in the first 12 months
33% Discount until October 31st
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$468 / Year
$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Sources

Release date

July 2014

Region

United States

Survey time period

2012

Statista Accounts: Access All Statistics. Starting from $468 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account.

Single Account
The ideal entry-level account for individual users
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references
$59 $39 / Month *
in the first 12 months
Corporate Account
Full access

Corporate solution including all features.

* All products require an annual contract; Prices do not include sales tax.

Statistics on "Crude oil industry of the Gulf Cooperation Council"

Statista Accounts: Access All Statistics. Starting from $468 / Year
Learn more about how Statista can support your business.