Costs of ongoing infrastructure projects of Philippine government 2019, by project

As of April 30, 2019, the cost of the Maritubog-Maridagao irrigation (phase II) project of the Philippine government was approximately 5.5 billion Philippine pesos. Located in Mindanao Island, the project is one of the five approved programs by the National Economic and Development Authority on the island.

Total costs of ongoing infrastructure projects of the government of the Philippines as of April 2019, by project

Exclusive Premium statistic

You need a Single Account for unlimited access.

  • Full access to 1m statistics

  • Incl. source references

  • Available to download in PNG, PDF, XLS format

Single Account

only $59 / month *
*Duration: 12 months, billed annually, single license

Access to this and all other statistics on 80,000 topics from

$708 / Year

Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

July 2019

Region

Philippines

Survey time period

as of April 30, 2019

Supplementary notes

One Philippine peso equals 0.02 U.S dollars and 0.018 euros as of April 2020.

Figures have been rounded.

Statista Accounts: Access All Statistics. Starting from $708 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.
This statistic is not included in your account.

Single Account
Your perfect start with Statista
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references
$59 / Month *
Corporate Account
Full access

Corporate solution including all features.

* All products require an annual contract; Prices do not include sales tax.

Statistics on "Construction sector in the Philippines"

Statista Accounts: Access All Statistics. Starting from $708 / Year
Learn more about how Statista can support your business.