This statistic shows the levelized electricity costs for new coal power plants in the United States in 2020 and 2040. In 2020, the capital costs of such energy generation are expected to stand at 8.32 U.S. dollar cents per kilowatt hour.
Levelized electricity costs for new coal power plants in the U.S. in 2020 and 2040 (in cents per kilowatt hour)*
Basic Account
Get to know the platform
You only have access to basic statistics.
This statistic is not included in your account.
Single Account
The ideal entry-level account for individual users
- Instant access to 1m statistics
- Download in XLS, PDF & PNG format
- Detailed references
$59 $39 / Month *
in the first 12 months
Corporate Account
Full access
Corporate solution including all features.
* Prices do not include sales tax.
Further Content: You might find this interesting as well
Statistics
- Global proposed coal power plants globally 2016, by status
- U.S. retail price of coal electricity generation by key state 2017
- U.S. wind power plants: levelized electricity costs
- U.S. natural gas power plants: levelized electricity costs 2020-2040
- U.S. power plants: total electricity costs, by source
- Select data on global offshore wind energy costs 2001-2015
- U.S. coal electricity generation: capacity additions 2040
- Coal power generation in Europe by country 2021
- Ontario's electricity costs by source 2016
- U.S. industrial consumer price estimates for coal energy
- Cost of petroleum coke for power generation in the U.S. 2006-2019
- Coal power plants in construction or proposed in Eurasia by capacity 2021
- Coal export shipments in Russia H1 2021, by region
EIA. (April 30, 2013). Levelized electricity costs for new coal power plants in the U.S. in 2020 and 2040 (in cents per kilowatt hour)* [Graph]. In Statista. Retrieved July 03, 2022, from https://www.statista.com/statistics/215018/levelized-electricity-costs-for-new-us-coal-power-plants/
EIA. "Levelized electricity costs for new coal power plants in the U.S. in 2020 and 2040 (in cents per kilowatt hour)*." Chart. April 30, 2013. Statista. Accessed July 03, 2022. https://www.statista.com/statistics/215018/levelized-electricity-costs-for-new-us-coal-power-plants/
EIA. (2013). Levelized electricity costs for new coal power plants in the U.S. in 2020 and 2040 (in cents per kilowatt hour)*. Statista. Statista Inc.. Accessed: July 03, 2022. https://www.statista.com/statistics/215018/levelized-electricity-costs-for-new-us-coal-power-plants/
EIA. "Levelized Electricity Costs for New Coal Power Plants in The U.S. in 2020 and 2040 (in Cents per Kilowatt Hour)*." Statista, Statista Inc., 30 Apr 2013, https://www.statista.com/statistics/215018/levelized-electricity-costs-for-new-us-coal-power-plants/
EIA, Levelized electricity costs for new coal power plants in the U.S. in 2020 and 2040 (in cents per kilowatt hour)* Statista, https://www.statista.com/statistics/215018/levelized-electricity-costs-for-new-us-coal-power-plants/ (last visited July 03, 2022)