Transmission entry capacity of wind farms in the United Kingdom (UK) 2010-2019

Transmission entry capacity (TEC) of wind power stations presented a trend of growth in the United Kingdom, peaking at 8,647 megawatts in 2019. In the period of consideration, figures increased by 6,780 megawatts.

Transmission entry capacity (TEC) of wind power stations in the United Kingdom (UK) from 2010 to 2019*

Loading statistic...
You need to log in to download this statistic
Register for free
Already a member?
Log in
Show detailed source information?
Register for free
Already a member?
Log in
Source

Release date

July 2020

Region

United Kingdom

Survey time period

2010 to 2019

Supplementary notes

Wind capacity is shown on declared net capability basis, and de-rated to account for intermittency, by factors of 0.365, 0.43 and 0.17 respectively.

Transmission Entry Capacity (TEC) is a Connection and Use of System Code term that defines a generator's maximum allowed export capacity onto the transmission system. The TEC register provides a publicly available record of the existing allocation of Transmission Entry Capacity (TEC), the business it is allocated to and the site details.

This data only covers major power producers.

Statista Accounts: Access All Statistics. Starting from $468 / Year
Basic Account
Get to know the platform

You only have access to basic statistics.

Single Account
The ideal entry-level account for individual users
  • Instant access to 1m statistics
  • Download in XLS, PDF & PNG format
  • Detailed references
$59 $39 / Month *
in the first 12 months
Corporate Account
Full access

Corporate solution including all features.

* Prices do not include sales tax.

Statistics on "Wind power in the UK"

Further Content: You might find this interesting as well

Statistics

Statista Accounts: Access All Statistics. Starting from $468 / Year
Learn more about how Statista can support your business.